CM Cares

Grashorn Family Project

The scope of this project includes the addition of a wheelchair accessible home entrance with an outdoor shade structure in the backyard for the whole family to enjoy, including Gavin, who is unable to sit or walk on his own.

Grashorn Family Project Fundraising Flyer

Gavin Grashorn



Project Updates

February 2014

  • Visited with family and took measurements for plans

March 2014

  • Filed for permits from HOA and building department
  • Demo of existing patio should occur last week of March
  • Bobcat of the Rockies donated a skid, breaker attachment, and auger for the patio demo
  • Mortenson donated an operator for the machine to remove the slab

April 2014

  • Concrete poured on April 5 thanks to the contributions of O'Brien Pumping
  • On April 12 a large group from Swinerton assisted with construction of the deck and pergola
  • Industry mentor John Spight of Swinerton and a couple others assisted with forming up the concrete wall-path and ramp up to the deck